







Your Custom Text Here
The Metropolitan Transportation Commission granted funds to the City of El Cerrito to develop a bicycle parking facility at the El Cerrito Plaza BART station. The City desired more than just bike parking; it wanted a landmark design statement as well. In 1999 Steven Grover & Associates was retained to provide architectural and engineering design services.
The City desired to provide bicycle parking that encourages bicycle use by being:
· More secure than just bike racks - so that bikes will not be stripped of components,
· Available on-demand, rather than only by long-term rental,
· Visible and attractive - so that people are actively reminded of the option of biking.
The roof structure design employs a shimmering flexible glazing material and a three-hinged arch framing system from laser-cut steel to create a light and elegant linear structure which contrasts with the heavy linear concrete structure of the BART station and elevated rail system.
Location:
El Cerrito, CA
Construction Cost:
$320,000
Client:
City of El Cerrito
Project Status:
Construction Complete
Scope: Architecture, Structural, Engineering, Public Process,, Bike/Ped Trail Design
The Metropolitan Transportation Commission granted funds to the City of El Cerrito to develop a bicycle parking facility at the El Cerrito Plaza BART station. The City desired more than just bike parking; it wanted a landmark design statement as well. In 1999 Steven Grover & Associates was retained to provide architectural and engineering design services.
The City desired to provide bicycle parking that encourages bicycle use by being:
· More secure than just bike racks - so that bikes will not be stripped of components,
· Available on-demand, rather than only by long-term rental,
· Visible and attractive - so that people are actively reminded of the option of biking.
The roof structure design employs a shimmering flexible glazing material and a three-hinged arch framing system from laser-cut steel to create a light and elegant linear structure which contrasts with the heavy linear concrete structure of the BART station and elevated rail system.
Location:
El Cerrito, CA
Construction Cost:
$320,000
Client:
City of El Cerrito
Project Status:
Construction Complete
Scope: Architecture, Structural, Engineering, Public Process,, Bike/Ped Trail Design